Statistical concrete control under the Spanish Structural Code
softQrate organises lots and series, calculates the estimated strength using the criterion that applies to the concrete plant and alerts you as soon as a lot fails, not when there are already slabs on top.
Lots and series without a spreadsheet
Every crushing result is assigned to its lot and series. softQrate groups the batches, tracks how many series each lot has and keeps the traceability of every specimen with its date, its author and its test report.
- Statistical, 100 % and indirect control modes.
- 7- and 28-day results linked to their series and their lab report.
- Lots and series by element and location on site.
The right acceptance criterion, applied automatically
The acceptance formula depends on the concrete plant. With certified dispersion, a quality mark or no seal, softQrate applies the matching case from the Spanish Structural Code (Código Estructural), including the Kn coefficient from table 57.5.4.3.b. The site quality director (DEO) can force a different case on a specific project if it is justified.
Alerts when a lot fails
Each lot is marked as compliant, at risk or non-compliant as soon as the results come in. You find out in time to order supplementary tests, not while preparing the final structural report.
Frequently asked questions
Frequently asked questions
The Spanish Structural Code (RD 470/2021), which replaced the EHE-08 and keeps the same statistical basis for concrete control.
The most conservative criterion applies, based on the lot's minimum result and the Kn coefficient from the Structural Code table.
You can, and it's free. If you prefer, Qate reads the lab report and loads the results into their series.
Keep reading
More on construction quality control
Try it on your
next project.
Your first project is free for two months, with 15 lab reports included. No card, no commitment.